Oil-Immersed Transformers Solar & Wind Step-Up SKU: 2000_KVA_PHOTOVOLTAIC_PV_GRID_TIE_THREE_PHASE_TRANSFORMER

2000 kVA Photovoltaic (PV) Grid-Tie Three-Phase Transformer

This 2000 kva photovoltaic (pv) grid-tie three-phase transformer is designed for renewable energy interconnection, step-up duty, and grid-side distribution applications. It supports stable operation in solar, wind, photovoltaic, and energy-storage projects where flexible voltage ratios, reliable cooling, and project-oriented outdoor design are required.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
Rated Capacity 2000 kVA
Primary Voltage (U1) 11,000 V (11 kV)
Secondary Voltage (U2) 415 V / 240 V (3-Phase 4-Wire)
Vector Group Dyn11
Rated Frequency 50 Hz
Cooling Method ONAN (Oil Natural Air Natural)
Primary Current (I1) 34.99 A
Secondary Current (I2) 2782.5 A
Guaranteed No-Load Loss (P0) 1900 W
Guaranteed Load Loss (Pk at 75°C) 14200 W
Short-Circuit Impedance (Uk) 5.0%
HV Insulation Level LI 75 / AC 35 (11kV Class)
Temperature Rise Limits Top Oil ≤ 50K, Winding ≤ 55K (45°C Ambient)
Creepage Distance ≥ 31 mm/kV (Outdoor Tropicalized Porcelain)
Core & Coil Weight 2900 kg
Insulating Oil Weight 1700 kg
Total Assembled Weight 5800 kg
Overall Footprint (L×W×H) 1980 mm × 1280 mm × 2080 mm
Governing Standards IEC 60076, BS 171, SON NIS, NERC Code

Technical Highlights

  • This product combines dependable transformer platform design, flexible project configuration, and practical export-oriented construction. It is suitable for applications requiring stable electrical performance, configurable voltage ratios, outdoor durability, and documentation support for international project supply.

Application Scenarios

  • Solar power plants
  • Wind farm collector and grid interface systems
  • Photovoltaic station and inverter interconnection projects
  • Battery energy storage systems (BESS)
  • Renewable energy substations and export EPC projects

Key Features

  • 2000 kVA rated capacity for renewable interconnection, step-up, or project-side power conversion
  • Designed for solar, wind, PV, or energy-storage power system applications
  • Configurable voltage ratio for inverter-side, collector-side, or grid-side connection
  • Oil-immersed construction for dependable cooling in outdoor renewable projects
  • Project-oriented accessory and monitoring options available
  • Suitable for IEC-based renewable projects and export EPC supply

Optional Configurations

  • Low-voltage side rating and voltage ratio
  • Frequency: 50 Hz or 60 Hz
  • Vector group and tapping range
  • Copper or aluminum winding
  • Cooling method, accessory package, and monitoring option
  • Tank structure, coating system, and special environmental adaptation
  • Color, nameplate language, and document package
  • Ambient temperature, altitude, and installation condition adaptation
XinHuan 2000 kVA Photovoltaic (PV) Grid-Tie Three-Phase Transformer 2D AutoCAD General Arrangement Drawing Blueprint
Engineering Submittal Drawing

2D AutoCAD General Arrangement (GA) Drawing & Footprint

Official XinHuan factory 2D vector General Arrangement drawing for 2000 kVA Photovoltaic (PV) Grid-Tie Three-Phase Transformer. Includes front elevation view, top plan view, terminal centerline clearances, base channel mounting footprint, and complete vector group connection schematics.

Dimensions ($L \times W \times H$ mm)
Terminal Centerline Clearances
Base Channel Mounting Pitch
Vector Group & Rating Plate
XinHuan Oil-Immersed Transformer Core Stacking & Assembly Workshop
XinHuan Hefei Manufacturing Plant — Precision Winding & Assembly Line
Factory Build Quality

Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Precision Tap Changer

De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.

Protection & Sensors

Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.

Quality Assurance

100% Factory Acceptance Testing (FAT) Protocol

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.

Logistics Intelligence

Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

The product is prepared for export shipment with suitable packing and transport arrangements based on destination and handling requirements. Technical documents, test reports, nameplate confirmation, and pre-shipment support can be supplied according to order requirements. OEM/ODM support and project-based coordination are available for qualified inquiries.

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for 2000 kVA Photovoltaic (PV) Grid-Tie Three-Phase Transformer.

Please send us your required capacity, high voltage, low voltage, frequency, cooling preference, and installation conditions for the 2000 kva photovoltaic (pv) grid-tie three-phase transformer. Our team can recommend a suitable configuration and provide a quotation based on your project requirements.

The product can be produced according to IEC standards and customer technical specifications. Routine factory tests, inspection records, and technical documentation can be provided before shipment. Optional configurations for project-specific grid, environmental, and accessory requirements are available upon request.

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).

Ready to Proceed?

Request a Firm Quotation for 2000 kVA Photovoltaic (PV) Grid-Tie...

Share your project specifications and receive an official CIF quotation within 24 hours.