Isolation Transformers Isolation & Step-Down Transformers SKU: DRY-3PH-200KVA

200kVA 415V/380V Three-Phase Dry-Type Step-Down Transformer

200 kVA three-phase dry-type step-down transformer converting 3-phase 415 V to 3-phase 380 V (±5% regulation). Copper windings, class H insulation, natural air cooling for reliable industrial voltage adaptation.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
Model Series SCB10 / SCB11 / SCB13 / SCB14
Rated Capacity 200 kVA
Primary Voltage (U1) 10,000 V (10 kV / 11 kV)
Secondary Voltage (U2) 400 V / 415 V / 480 V (3-Phase 4-Wire)
Vector Group Dyn11
Rated Frequency 50 Hz / 60 Hz
Cooling Method AN (Natural Air) / AF (Forced Air Blower)
Primary Current (I1) 11.55 A
Secondary Current (I2) 278.3 A
Guaranteed No-Load Loss (P0) 620 W
Guaranteed Load Loss (Pk at 120°C) 2470 W
Short-Circuit Impedance (Uk) 4.0%
Insulation Class F Class (155°C) / H Class (180°C) Epoxy Cast Resin
Temperature Rise Limit Winding Temp Rise ≤ 100 K (F Class) / ≤ 125 K (H Class)
IP Protection Class IP00 (Open Type) / IP20 (Indoor Enclosure) / IP23 (Loubered)
Total Weight 1150 kg
Overall Footprint (L×W×H) 1000 mm × 750 mm × 1080 mm
Governing Standards IEC 60076-11, GB/T 10228-2015, CE, ISO 9001
XinHuan 200kVA 415V/380V Three-Phase Dry-Type Step-Down Transformer 2D AutoCAD General Arrangement Drawing Blueprint
Engineering Submittal Drawing

2D AutoCAD General Arrangement (GA) Drawing & Footprint

Official XinHuan factory 2D vector General Arrangement drawing for 200kVA 415V/380V Three-Phase Dry-Type Step-Down Transformer. Includes front elevation view, top plan view, terminal centerline clearances, base channel mounting footprint, and complete vector group connection schematics.

Dimensions ($L \times W \times H$ mm)
Terminal Centerline Clearances
Base Channel Mounting Pitch
Vector Group & Rating Plate
XinHuan Cast Resin Dry-Type Transformer Precision Winding & Assembly Workshop
XinHuan Hefei Manufacturing Plant — Precision Winding & Assembly Line
Factory Build Quality

Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Precision Tap Changer

De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.

Protection & Sensors

Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.

Quality Assurance

100% Factory Acceptance Testing (FAT) Protocol

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.

Logistics Intelligence

Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

On-site installation and commissioning support available. Customizable mounting and cooling solutions.

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for 200kVA 415V/380V Three-Phase Dry-Type Step-Down Transformer.

Request quotes for industrial voltage conversion projects

IEC 61558-1, IEC 60050-421, Thermal protection class H

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).

Ready to Proceed?

Request a Firm Quotation for 200kVA 415V/380V Three-Phase Dry-Type...

Share your project specifications and receive an official CIF quotation within 24 hours.