AREQUIPA REGION, PERU (ELEVATION 3,850M ASL) • ENGINEERING CASE STUDY

秘鲁安第斯铜矿5 MVA 33kV高海拔矿用变电站

定制高海拔工程 5 MVA 33kV 电力变压器,具有高爬电距离套管 (>31mm/kV)、降额冷却和 IP54 室外防护,适用于连续的安第斯铜矿开采作业。

工业领域
矿山冶金
设备范围
5000千伏安(5兆伏安)
初级电压
33 kV / 0.48 kV
合规标准
IEC 60076 / IEEE / ANSI
由资深电气工程团队撰写 经过验证和 FAT 认证
合肥高压变压器实验室 · IEC 60076 和 IEEE C57 标准合规性 · 更新于 2026 年 10 月
秘鲁安第斯铜矿5 MVA 33kV高海拔矿用变电站
Project Installation Visual — Arequipa Region, Peru (Elevation 3,850m ASL)

1. 项目背景和运营挑战

High-altitude Andean mining operations (>3,500m ASL) experience severe atmospheric pressure drop and thin air dielectric insulation loss, high UV radiation, and wide ambient temperature fluctuations (ΔT = 45°C). Standard distribution transformers suffer severe thermal overheating and premature dielectric insulation breakdown when operated at altitude without specialized derating engineering.

2. 定制工程解决方案

XinHuan sales engineers designed a custom high-altitude 5000 kVA 33kV/0.48kV oil-immersed power transformer with expanded radiator cooling surface (+25% heat dissipation reserve), grain-oriented silicon steel core mitered step-lap miter joints to minimize no-load losses, high creepage distance porcelain bushings (>31mm/kV), and C5-M heavy industrial anti-corrosion marine paint.

Derated High-Altitude Thermal Design
Calculated heat dissipation for 3,850m ASL with +25% radiator cooling headroom.
High Creepage Bushings (>31mm/kV)
Prevents atmospheric flashover in low-density mountain air and heavy mining dust.
C5-M Anti-Corrosion Paint System
4-coat epoxy polyurethane marine coating resisting acidic mine dust and extreme weathering.
Full Routine FAT & Oil BDV Testing
100% factory acceptance tested with oil dielectric breakdown voltage >60kV.

3. 安装设备参数和额定值

参数规格 设计评级和认证值
额定容量 5000千伏安(5兆伏安)
初级电压 33 kV (33,000V)
二次电压 0.48 kV (480V 3-Phase)
Installation Elevation 3,850 Meters Above Sea Level (ASL)
冷却方式 ONAN(天然油、天然空气)
向量组 Dyn11
短路阻抗 7.0%
标准合规性 IEC 60076-1 / ANSI C57.12
工厂保修 36 Months Manufacturer Warranty

4. 项目成果和现场绩效

The 5 MVA unit was shipped direct to Port of Matarani & Callao, Peru. Commissioned in 2024, the transformer has operated continuously for over 18 months through peak copper crushing cycles with zero thermal trips and perfectly stable oil temperatures.

EPC顾问验证
“新环按计划交付了完整的例行测试证书、CAD 提交图纸和 CIF 海港运费。变压器在首次通电调试时通过了所有现场验收测试 (SAT)。”