REGIONAL TRANSMISSION & DISTRIBUTION FEEDER NETWORK • ENGINEERING CASE STUDY

31.5 MVA 110kV 半挂车移动变电站用于紧急电网恢复

快速部署 31.5 MVA 110kV 移动变电站拖车,配有集成 SF6 GIS 开关设备、OLTC 电力变压器和数字继电保护系统,可实现即时紧急电力恢复。

工业领域
电力公用事业和基础设施
设备范围
31.5 兆伏安(31,500 千伏安)
初级电压
110 kV / 13.8 kV
合规标准
IEC 60076 / IEEE / ANSI
由资深电气工程团队撰写 经过验证和 FAT 认证
合肥高压变压器实验室 · IEC 60076 和 IEEE C57 标准合规性 · 更新于 2026 年 10 月
31.5 MVA 110kV 半挂车移动变电站用于紧急电网恢复
Project Installation Visual — Regional Transmission & Distribution Feeder Network

1. 项目背景和运营挑战

Regional utilities face prolonged blackout risks during storm damage, transformer maintenance overhauls, or sudden feeder overloads. Standard stationary substations require 6 to 12 months to construct, leaving critical loads vulnerable during emergency outages.

2. 定制工程解决方案

XinHuan engineered a complete 31.5 MVA 110kV/13.8kV mobile substation mounted on a multi-axle heavy-duty semi-trailer. The system integrates a compact 110kV SF6 Gas Insulated Switchgear (GIS), an On-Load Tap Changing (OLTC) power transformer, 13.8kV metal-clad output switchgear, and digital micro-processor protection relays.

Rapid Deployment < 4 Hours
Hydraulic leveling jacks and plug-and-play medium voltage cable heads for fast commissioning.
Compact SF6 GIS Switchgear
Space-saving high-voltage gas insulated switchgear engineered for transport vibration resistance.
有载分接开关 (OLTC)
Automatic voltage regulation under load across ±8x1.25% tap steps.
Road-Legal Trailer Transport
Optimized axle load distribution complying with international highway transport regulations.

3. 安装设备参数和额定值

参数规格 设计评级和认证值
Substation Capacity 31.5 兆伏安(31,500 千伏安)
High Voltage Rating 110 kV
Low Voltage Rating 13.8 kV / 11 kV
HV Switchgear SF6 GIS (Gas Insulated Switchgear)
Transformer Cooling ONAN / ONAF Dual Speed Fans
分接开关 Vacuum On-Load Tap Changer (OLTC)
Transport Platform Multi-Axle Heavy Semi-Trailer Skid
Inspection Certification 100% CNAS Factory Acceptance Tested

4. 项目成果和现场绩效

The mobile substation reduced emergency outage downtime from 72 hours to under 4 hours, enabling utility engineers to perform planned substation overhauls without interrupting customer power.

EPC顾问验证
“新环按计划交付了完整的例行测试证书、CAD 提交图纸和 CIF 海港运费。变压器在首次通电调试时通过了所有现场验收测试 (SAT)。”