Regional Transmission & Distribution Feeder Network

31.5 MVA 110kV Semi-Trailer Mounted Mobile Substation for Emergency Utility Grid Restoration

Rapid-deployment 31.5 MVA 110kV mobile substation trailer with integrated SF6 GIS switchgear, OLTC power transformer, and digital protection relay system for instant emergency power restoration.

Industry Sector
Power Utility & Infrastructure
Equipment Scope
31.5 MVA (31,500 kVA)
Primary Voltage
110 kV / 13.8 kV
Compliance Standard
IEC 60076 / IEEE / ANSI
31.5 MVA 110kV Semi-Trailer Mounted Mobile Substation for Emergency Utility Grid Restoration
Project Installation Visual — Regional Transmission & Distribution Feeder Network

1. Project Context & Operational Challenge

Regional utilities face prolonged blackout risks during storm damage, transformer maintenance overhauls, or sudden feeder overloads. Standard stationary substations require 6 to 12 months to construct, leaving critical loads vulnerable during emergency outages.

2. Customized Engineering Solution

XinHuan engineered a complete 31.5 MVA 110kV/13.8kV mobile substation mounted on a multi-axle heavy-duty semi-trailer. The system integrates a compact 110kV SF6 Gas Insulated Switchgear (GIS), an On-Load Tap Changing (OLTC) power transformer, 13.8kV metal-clad output switchgear, and digital micro-processor protection relays.

Rapid Deployment < 4 Hours
Hydraulic leveling jacks and plug-and-play medium voltage cable heads for fast commissioning.
Compact SF6 GIS Switchgear
Space-saving high-voltage gas insulated switchgear engineered for transport vibration resistance.
On-Load Tap Changer (OLTC)
Automatic voltage regulation under load across ±8x1.25% tap steps.
Road-Legal Trailer Transport
Optimized axle load distribution complying with international highway transport regulations.

3. Installed Equipment Parameters & Ratings

Parameter Specification Design Rating & Certified Value
Substation Capacity 31.5 MVA (31,500 kVA)
High Voltage Rating 110 kV
Low Voltage Rating 13.8 kV / 11 kV
HV Switchgear SF6 GIS (Gas Insulated Switchgear)
Transformer Cooling ONAN / ONAF Dual Speed Fans
Tap Changer Vacuum On-Load Tap Changer (OLTC)
Transport Platform Multi-Axle Heavy Semi-Trailer Skid
Inspection Certification 100% CNAS Factory Acceptance Tested

4. Project Outcomes & Field Performance

The mobile substation reduced emergency outage downtime from 72 hours to under 4 hours, enabling utility engineers to perform planned substation overhauls without interrupting customer power.

EPC Consultant Verification
"XinHuan delivered complete routine test certificates, CAD submittal drawings, and CIF seaport freight within schedule. The transformer passed all site acceptance testing (SAT) on first energized commissioning."
Direct Factory Quotation

Need a Similar Technical Submittal?

Our engineering team provides 2D AutoCAD General Arrangement drawings, electrical parameter submittals, and CIF seaport quotes within 24 hours.


Matching Product SKUs