Compact Substations Mobile Substations SKU: 110KV_31_5MVA_SEMI_TRAILER_MOUNTED_MOBILE_SUBSTATION

31.5 MVA 110kV Semi-Trailer Mounted Mobile Transformer Substation

XinHuan 31.5 MVA Semi-Trailer Mounted Mobile Transformer Substation. Complete containerized substation on heavy-duty multi-axle chassis with integrated GIS, power transformer, / switchgear, and microclimate control cabin for emergency grid restoration and temporary mining/utility power.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
Rated Capacity 31.5 MVA (31,500 kVA)
Primary Voltage (HV) 110 kV (±2×2.5% OLTC / OCTC)
Secondary Voltage (LV) 10.5 kV / 33 kV
Rated Frequency 50 Hz / 60 Hz
Cooling Type ONAN / ONAF (Automated Forced Air)
Vector Group YNd11 / YNyn0
HV Switchgear 110kV SF6 Gas-Insulated Switchgear (GIS, 31.5kA)
MV Switchgear 10kV / 33kV Metal-Clad Vacuum Switchgear (KYN28 / YRM6)
Transport Chassis Heavy-Duty Multi-Axle Semi-Trailer with Hydraulic Stabilizers
Control Enclosure Walk-In IP54 Microclimate Cabin with SCADA & RTU
Standards Compliance IEC 60076, IEC 62271-200, IEC 62271-202, IEEE C57.12

Core

  • Rapid Grid Deployment: Full substation commissioning in under 24 hours for emergency restoration, grid maintenance bypass, and remote mining sites.
  • Multi-Axle Heavy-Duty Transport Chassis: Compatible with Sitrak/heavy tractor trucks, engineered for cross-country highway and unpaved terrain transport.
  • Hermetic SF6 Gas-Insulated Switchgear (GIS): Compact footprint with high impulse withstand and maintenance-free operation.
  • Integrated Microclimate SCADA Control Cabin: IP54 temperature-controlled operator room with protection relays, remote telemetry, and auxiliary AC/DC distribution.
  • Dual Cooling System: ONAN/ONAF high-efficiency radiators with automated low-noise forced air cooling for continuous full-load operation in ambient temperatures up to 50°C.

Engineering Submittal & Layout Workbench

Substation Room Fit & Multi-Equipment CAD Footprints

Select your equipment type and capacity to inspect verified GA engineering CAD line drawings, Single Line Diagrams (SLD), dimensions (L × W × H), roller gauge, and submittal clearances before procurement.

Available Ratings:
IEC 60076-1 Submittal Specs
XinHuan Engineering GA CAD Drawing
XinHuan Engineering Single Line Diagram (SLD)
11kV / 33kV Dual Voltage
IEC 60076 / IEEE Compliant
100% Routine Factory Tested
Export Nitrogen / Seaworthy Pack

1000 kVA Technical Dimensions

IEC 60076-1

International utility & industrial submittal specifications

Overall Length (L) 1,750 mm
Overall Width (W) 1,120 mm
Overall Height (H) 1,780 mm
Roller Wheel Track Gauge (D) 820 mm
Total Equipment Net Weight 3,820 kg
Min Substation Clearance 1,000 mm surrounding
Rated Voltage / System 11 kV / 33 kV Dual Primary
Applicable Standard IEC 60076-1 / IEEE C57
Download Technical Data Sheet (PDF) Request Factory Engineering Submittal Package

Full CAD DXF/DWG vector footprints, 3D STEP models, and custom project submittals provided within 2 hours upon request.

XinHuan Prefabricated Substation and Switchgear Assembly Line
XinHuan Hefei Manufacturing Plant — Precision Winding & Assembly Line
Factory Build Quality

Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Precision Tap Changer

De-energized tap switch ($\pm 2 \times 2.5\%$) or on-load vacuum tap changer (OLTC) optional.

Protection & Sensors

Buchholz gas relay, magnetic oil gauge (MOG), and dial thermometers with alarm contacts.

Quality Assurance

100% Factory Acceptance Testing (FAT) Protocol

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Ultra-low discharge (<5 pC) and pressurized oil/gas tightness test.

Logistics Intelligence

Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

Heavy-duty export packing with moisture-proof wrapping & transport securing

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for 31.5 MVA 110kV Semi-Trailer Mounted Mobile Transformer Substation.

Contact XinHuan engineering team for customized mobile substation designs.

IEC 60076, IEC 62271-200, IEC 62271-202, IEEE C57.12

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).

Ready to Proceed?

Request a Firm Quotation for 31.5 MVA 110kV Semi-Trailer Mounted...

Share your project specifications and receive an official CIF quotation within 24 hours.