Atacama Desert, Antofagasta, Chile

2500 kVA Solar PV Step-Up Substation Package in Atacama Desert, Chile

Low-loss 2500 kVA 33kV solar step-up transformer package engineered for high UV, extreme sandstorm abrasion, and 60Hz Chilean utility grid integration.

Industry Sector
Renewable Solar Energy
Equipment Scope
2500 kVA (2.5 MVA)
Primary Voltage
33 kV / 0.69 kV
Compliance Standard
IEC 60076 / IEEE / ANSI
2500 kVA Solar PV Step-Up Substation Package in Atacama Desert, Chile
Project Installation Visual — Atacama Desert, Antofagasta, Chile

1. Project Context & Operational Challenge

Solar PV plants in the Atacama Desert endure extreme solar irradiance, airborne silica dust abrasion, and harsh daily thermal cycles. Utility power purchase agreements require strict grid compliance and ultra-low no-load idle losses to prevent energy revenue loss during nighttime non-generating hours.

2. Customized Engineering Solution

XinHuan delivered a specialized 2500 kVA 33kV/0.69kV solar step-up transformer featuring an S13 ultra-low loss silicon steel magnetic core, hermetically sealed corrugated oil tank with nitrogen cushion, sand-proof IP65 terminal cabinets, and 60Hz frequency optimization.

Ultra-Low No-Load Loss Core
S13 series step-lap silicon steel core saves over $14,200 annually in idle energy losses.
Sand & Dust Proof IP65 Cabinets
Sealed terminal boxes preventing silica sand ingress into high-voltage connections.
Hermetic Tank & Corrugated Radiators
Zero oil-to-air contact, eliminating oil oxidation and moisture contamination.
60Hz Chilean Grid Compliance
Designed to Chilean SEC regulations and IEC 60076 solar application guidelines.

3. Installed Equipment Parameters & Ratings

Parameter Specification Design Rating & Certified Value
Rated Capacity 2500 kVA (2.5 MVA)
Primary Voltage 33 kV
Secondary Voltage 0.69 kV (Inverter AC Output)
Frequency 60 Hz
No-Load Loss (Po) 1,980 W
Load Loss (Pk) 12,700 W
Enclosure Protection IP65 Outdoor Dust-Proof
Delivery Terms CIF Port of Antofagasta / Valparaíso

4. Project Outcomes & Field Performance

Installed in a 50MW Solar PV facility, the transformer package achieved 100% grid compliance sign-off by Chilean inspectors and has delivered 99.98% operational efficiency.

EPC Consultant Verification
"XinHuan delivered complete routine test certificates, CAD submittal drawings, and CIF seaport freight within schedule. The transformer passed all site acceptance testing (SAT) on first energized commissioning."
Direct Factory Quotation

Need a Similar Technical Submittal?

Our engineering team provides 2D AutoCAD General Arrangement drawings, electrical parameter submittals, and CIF seaport quotes within 24 hours.


Matching Product SKUs