Compact Substations Pad-Mounted Transformers SKU: 2500KVA_34.5KV_THREE_PHASE_PAD_MOUNTED_TRANSFORMER

2500 kVA Three-Phase Pad-Mounted Transformer (ANSI C57.12.20)

Factory-direct 2500 kVA pad-mounted transformer engineered to ANSI C57.12.20 standards, ideal for underground distribution. Benefit from competitive pricing and reliable lead times directly from our ISO-certified Chinese manufacturing facility.

Compliance Standards
IEC • ANSI • IEEE • GB
Quality Inspection
100% FAT Routine Tested
Engineering CAD
2D CAD / SLD Schematics
Global Logistics
Direct Seaport CIF Export
Engineering Datasheet

Technical Parameters & Ratings

Print Submittal Datasheet IEC / ANSI Certified Factory Standard
Rated Capacity 2500
Primary Voltage 34.5 kV primary / 480Y/277 V secondary (customizable)
Secondary Voltage 480Y/277 V, 208Y/120 V
Standards Compliance ANSI C57.12.20, IEEE, NEMA
Cooling Type ONAN
Configuration Dead-front, Loop feed / Radial feed
Vector Group Dyn11 (or as specified)
Frequency 60 Hz (ANSI) / 50 Hz (IEC)
Efficiency Level 99.2%
Impedance (%Z) 5.75%
Insulation Class Class A (65°C average temperature rise)
Enclosure Rating NEMA 3R / IP54 Tamper-Resistant Steel Enclosure
Voltage 34.5 kV primary / 480Y/277 V secondary (customizable)
Kva 2500
Standard ANSI C57.12.20, IEEE, NEMA
Cooling ONAN
Efficiency 99.2%
Impedance 5.75%

Application Scenarios

  • Commercial centers, solar PV collector substations, EV fast-charging hubs, and industrial parks.

Features

  • Dead-front cabinet design with compartmentalized HV and LV sections for maximum operator safety.
  • Bay-O-Net expulsion fuses with current-limiting backup fuses for robust overcurrent protection.
  • Corrosion-resistant NEMA 3R enclosure with tamper-proof penta-head locking hardware.

Standards

  • 100% Factory Acceptance Testing (FAT) including voltage ratio, dielectric withstand, and winding resistance.

Engineering Submittal & Layout Workbench

Substation Room Fit & Multi-Equipment CAD Footprints

Select your equipment type and capacity to inspect verified GA engineering CAD line drawings, Single Line Diagrams (SLD), dimensions (L × W × H), roller gauge, and submittal clearances before procurement.

Available Ratings:
IEC 60076-1 Submittal Specs
XinHuan Engineering GA CAD Drawing
XinHuan Engineering Single Line Diagram (SLD)
11kV / 33kV Dual Voltage
IEC 60076 / IEEE Compliant
100% Routine Factory Tested
Export Nitrogen / Seaworthy Pack

1000 kVA Technical Dimensions

IEC 60076-1

International utility & industrial submittal specifications

Overall Length (L) 1,750 mm
Overall Width (W) 1,120 mm
Overall Height (H) 1,780 mm
Roller Wheel Track Gauge (D) 820 mm
Total Equipment Net Weight 3,820 kg
Min Substation Clearance 1,000 mm surrounding
Rated Voltage / System 11 kV / 33 kV Dual Primary
Applicable Standard IEC 60076-1 / IEEE C57
Download Technical Data Sheet (PDF) Request Factory Engineering Submittal Package

Full CAD DXF/DWG vector footprints, 3D STEP models, and custom project submittals provided within 2 hours upon request.

XinHuan American-Type Pad-Mounted Substation Assembly Line
XinHuan Hefei Manufacturing Plant — American-Type Pad-Mounted Substation Assembly Line
Factory Build Quality

Internal Construction & Premium Materials

Built with tier-1 certified raw materials engineered for long operational life (>30 years), superior dielectric withstand, and high short-circuit withstand capacity.

Silicon Steel Core

High-grade grain-oriented cold-rolled silicon steel with step-lap mitered joints for low $P_o$ losses.

100% Copper Windings

Electrolytic oxygen-free copper with high thermal grade insulation for surge resistance.

Loadbreak Switching

Two-position (radial) or four-position (loop feed) oil-immersed rotary loadbreak switch rated up to 630A.

ANSI Pad Protection

Bay-O-Net expulsion fuse in series with ELSP back-up fuse, automatic pressure relief valve, and liquid level gauge.

Quality Assurance

100% Factory Acceptance Testing (FAT) Protocol

CNAS & ISO 9001 Certified

Every transformer unit manufactured by XinHuan undergoes mandatory routine factory testing prior to container dispatch. Full certified routine and type test submittal reports are provided with commercial documentation:

1. Insulation Resistance

Megger test (HV to LV, HV to Earth, LV to Earth) >1000 MΩ.

2. Voltage Ratio & Vector

Turns ratio check across all taps with phase displacement check.

3. Winding DC Resistance

Precision Kelvin bridge measurement across all tap positions.

4. Short-Circuit Impedance

Load loss ($P_k$) measurement corrected to reference temp (75°C).

5. No-Load Loss & Current

Core excitation test ($P_o$ and $I_o$) at rated sinusoidal voltage.

6. AC Voltage Withstand

Power-frequency separate source test (e.g. 50kV/70kV 1 min).

7. Lightning Impulse (BIL)

Full wave & chopped wave impulse withstand (BIL up to 170kV).

8. Partial Discharge & Seals

Dead-front dielectric test, ANSI C57.12.28 tamper resistance & pressurized tank seal verification.

Logistics Intelligence

Export Packaging & Seaport Logistics

Global CIF / FOB Delivery

Export seaworthy packaging with vacuum moisture barrier, desiccants, and reinforced steel-framed containment. Typical production lead time: 4–6 weeks from drawing approval.

Production Lead Time

Standard manufacturing cycle is 4 to 6 weeks from approval of GA blueprints and single-line diagrams.

Heavy-Duty Export Packaging

Vacuum moisture barrier preservation, nitrogen blanketing, and reinforced steel-frame structural crate skids.

Direct Seaport Routes

Fast ocean freight to Port of Chancay & Callao (25-35 days), Manila, Lagos, and Middle East ports.

Equipment Video Inspection

100% Tested

Watch XinHuan technicians perform routine dielectric testing, winding insulation checks, and quality inspections inside our Hefei manufacturing plant.

Every unit 100% routine tested before container loading.
Direct Factory Consultation

Need Custom Project Engineering?

Send your single-line diagram (SLD), voltage ratings, or tender specifications. Our chief electrical engineers will review and issue an actionable CIF quotation within 24 hours.

Custom Voltage Ratios
High-Altitude Derating
Short-Circuit Impedance
Third-Party FAT Witness

Engineering & Procurement FAQs

Frequently asked questions regarding specifications, certifications, and delivery for 2500 kVA Three-Phase Pad-Mounted Transformer (ANSI C57.12.20).

Please specify rated capacity (kVA), primary/secondary voltages, frequency (50/60Hz), standard (IEC/ANSI), cooling type, site altitude, and target destination port.

Manufactured and tested in strict accordance with ANSI C57.12.20, IEEE, NEMA. Certified factory routine test report (FAT) provided with every unit. Third-party inspection (SGS/BV) supported.

Standard manufacturing lead time is 4 to 6 weeks following approval of GA blueprints and single-line diagrams. Direct sea container shipping is available under FOB, CFR, or CIF terms with full customs documentation (Bill of Lading, Certificate of Origin, Test Reports).

Ready to Proceed?

Request a Firm Quotation for 2500 kVA Three-Phase Pad-Mounted...

Share your project specifications and receive an official CIF quotation within 24 hours.