No-Load Loss P0
Core loss in watts. It depends on core material and is present whenever the transformer is energized.
Engineering Tool
Estimate transformer efficiency, no-load loss, load loss, yearly kWh loss, and electricity cost. Compare two designs to see which option is cheaper to operate.
Real Load Curve
Loss x Load^2
Please enter valid capacity, load, and loss values.
Efficiency results will appear here
Use transformer test report losses or manufacturer guaranteed loss values.
Option A Efficiency
at selected load
Annual Cost
Option A loss
Savings
B vs A / year
Load loss changes with load squared; no-load loss is constant.
| Metric | Option A | Option B |
|---|
How to Use Loss Values
Use guaranteed no-load and load-loss values from a manufacturer datasheet, tender document, or routine test report. If you only know capacity and voltage, send the project data to XinHuan and we can recommend an appropriate loss level.
Core loss in watts. It depends on core material and is present whenever the transformer is energized.
Copper/winding loss at rated current. Actual load loss is Pk multiplied by load ratio squared.
Use expected average operating load, not only peak load. Energy cost depends heavily on this value.
When international electric utilities and EPC contractors evaluate transformer tenders, the lowest bid price is rarely the winning bid. Modern procurement uses Total Cost of Ownership (TCO) Loss Capitalization to evaluate the true financial cost over a 25 to 30 year operating lifespan.
Standard Utility TCO Evaluation Formula
Because A-Factor is typically 3× to 5× higher than B-Factor, reducing core loss (P0) by upgrading to laser-scribed high-grade silicon steel (S13/S22/SCB14) delivers massive long-term OPEX returns for continuous utility operations.
| Grid / Utility Region | A-Factor (No-Load) | B-Factor (Load) | Evaluation Life |
|---|---|---|---|
| North America (IEEE C57) | $6.50 – $9.50 / W | $2.00 – $3.80 / W | 30 Years |
| European Union (Ecodesign Tier 2) | €7.00 – €11.00 / W | €1.80 – €3.20 / W | 25–30 Years |
| Sub-Saharan Africa & MENA | $4.50 – $7.20 / W | $1.40 – $2.60 / W | 25 Years |
| Asia-Pacific (State Grid / SE Asia) | $5.00 – $8.00 / W | $1.50 – $2.80 / W | 25 Years |
* Exact A and B factors are defined in tender tender specifications based on discount interest rate (\(i\)), electricity cost ($/kWh), and planned loading factor.
Efficiency Benchmark
Based on continuous operation (8,760 hrs/yr), 65% average loading factor, and an industrial electricity tariff of $0.12/kWh.
| Rating (kVA) | Standard S11 Annual Loss | High-Efficiency S13 Annual Loss | Ultra-Low S22 Annual Loss | Annual OPEX Savings | 25-Year Cumulative Savings |
|---|---|---|---|---|---|
| 500 kVA | 31,250 kWh ($3,750) | 24,800 kWh ($2,976) | 19,500 kWh ($2,340) | +$1,410 / yr | +$35,250 |
| 1,000 kVA (1 MVA) | 56,400 kWh ($6,768) | 44,200 kWh ($5,304) | 34,800 kWh ($4,176) | +$2,592 / yr | +$64,800 |
| 2,500 kVA (2.5 MVA) | 128,500 kWh ($15,420) | 101,200 kWh ($12,144) | 79,600 kWh ($9,552) | +$5,868 / yr | +$146,700 |